Fees for new connection ;

Application has to be submitted in Member Service Division with Feasibility Fee as follows:

Description of Service

Consumer No.

Application/Feasibility Fee

Domestic/Commercial/Charitable Institute/ Street Light

01 to 09 Consumer

Tk.100/- (per person)

10 to 20 Consumer

Tk.1,500/- (fixed)

21 and above

Tk.2,000/- (fixed)

DTW/STW/LLP

Each

Tk.250/- (fixed)

Any type of Temporary/Provisional Connection

Each

Tk.1,500/-

Any Temporary/Provisional Connection other than specified above or Industry

Each

Tk.1,500/-

Pole Transfer/Line Route Change or Transfer of Other Consumers Service Drop Installed by PBS

Each

Tk.500/-

Connection for Industry (GP)

Each

Tk.2,500/-

Connection for Large Industry (LP)

Each

Tk.5,000/-

Load Extension

Upto 0-10 KW

Tk.1,000/-

Upto 11-45 KW

Tk.2,000/-

46 KW and Above

Tk.5,000/-

 

Security Deposit(Dometic)

Load Description

Deposit Rate (Tk.)

0.50 KW

Tk.500/- (fixed)

0.50 KW Above to 1.00 KW

Tk.600/- (fixed)

Additional Per KW Above 1.00 KW

Tk.200/-

After completing the procedure, connection will be established by Consumer Meter Order (CMO). Service Drop Cable, Meter and other necessary equipments required for connection will be provided by the PBS at free of cost.

 

Connection Procedure for Domestic/Commercial/CI Consumer under Service Drop (100 feet)

Application has to be submitted with 2 (two) copy passport size photograph and Feasibility Fee. After completion of the feasibility study and approval by the Member Service Department, consumer has to be complete wiring at his own expenses by the PBS approved electrician. Finally after depositing the required fees and security deposit, connection will be established.

 

Rules for Extension of Single Pole

There are provisions of extension of a single pole from existing distribution line of PBS to connect minimum 2 consumers upon sanction of materials by the authority.

 

Line Construction under Master Plan

Electric Line will be constructed according to priority serial and yearly sanction of the Master Plan. The minimum qualifying revenue for per year is Tk.45,000/= (forty five thousand) per kilometer. Priority will be given to more revenue income comparison to line construction.

 

Rules of Connection under Deposit Work (Self Finance)

If any line construction does not fulfill the minimum qualifying revenue and/or not under priority serial, but can fulfill at least 50% qualifying revenue, consumer can apply for the line construction under self financed deposit work. But, the mileage should be approved before by the authority.

 

Rules for Irrigation Connection

01. Application should be submitted in prescribed form with 2 (two) copies passport size photograph along with Tk.250/= (two hundred fifty) Feasibility Fee;

 

02. If the distance is more than 100 feet from the distribution line, additional payment must be pay by theconsumer for the extra temporary line construction cost. Extra temporary line will be constructed, if itfulfills the minimum qualifying revenue and is within technically accepted distance;

 

03. Season will be calculated 5 months for the STW/LLP Consumer and 8 months for the DTW Consumer;

 

Rules for Industrial Connection

01. Application should be submitted in prescribed form with 2 (two) copies passport size photograph along with Tk.250/= (two hundred fifty) Feasibility Fee;

 

02. After Feasibility & Staking (if applicable) line construction cost to be deposited under self financeddeposit work. After Line construction and Wiring Inspection, security deposit amount to be submitted for connection;

 

03. If applicable, Clearance Certificate may be required form Department of Environment and Local Government/Administration;