Side Connection Penalty ;

The consumer is not permitted to resale energy or to use the energy from his own metered service for others by Side Connection under any circumstances. The use of an extension cord or any other unapproved wiring to serve any premises other than the consumers metered, inspected and approved place, shall cause immediate disconnection and the assessment of the following penalty as applicable:

Side Connection provided to electricity use by Domestic or Charitable Institute, penalty imposed for Each Connection

Tk.250/=

Side Connection provided to electricity use by Commercial user, penalty imposed for Each Connection

Tk.500/=

Side Connection provided to electricity use by Irrigation user, penalty imposed for Each Connection

Tk.1,500/=

Side Connection provided to electricity use by GP or LP user, penalty imposed for Each Connection

Tk.3,000/=

 

 

 

Power Factor Measurement

At the meter end of inductive load consumers (like Industrial Consumer over 10HP Load & Motor used by Irrigation Consumer), the Power Factor shall be minimum 95% lagging, otherwise penalty shall be imposed as per Rate Schedule of the PBS. This penalty is meant to encourage the consumer to install necessary capacitors to improve the Power Factor which will benefit both the consumer and the PBS in many ways.

 

Charges for Electrical Wiring

Minimum charge for Each House Wiring =   Tk.200/=(tk. 300/= for Bilding)
Minimum charge for Irrigation Pump, Single Phase=  Tk.700/= & Three Phase = Tk.1000/=
Minimum charge for Industry, Single Phase  =  Tk.700/= & Three Phase = Tk.1500/=

 

Connection Disconnection & Re-connection Fee

 

Type

Description

Disconnection Fee

Re-connection Fee

D, CI

Domestic, Charitable Institute

Tk.100/=

Tk.50/=

DOS

Commercial

Tk.150/=

Tk.75/=

S.L

Street Light

Tk.100/=

Tk.100/=

Irrigation

A) For Single Phase Connection

Tk.100/=

Tk.100/=

B) For Three Phase Connection

Tk.200/=

Tk.200/=

GP, LP Three Phase Connection

a) Single Phase Connection

Tk.200/=

Tk.200/=

b) Up to 10 KVA

Tk.200/=

Tk.200/=

c) 11 KVA up to 45 KVA

Tk.500/=

Tk.500/=

d) 46 KVA up to 75 KVA

Tk.750/=

Tk.750/=

e) 76 KVA up to 150 KVA

Tk.1,000/=

Tk.1,000/=

f) 151 KVA and Above

Tk.1,500/=

Tk.1,500/=

 

Meter Testing Fee

Tariff Type

Description

Testing Fee

Domestic, Commercial, CI, Street Light

a) Single Phase Connection

Tk.100/=

b) Three Phase Connection

Tk.200/=

Irrigation

a) Single Phase Connection

Tk.200/=

b) Three Phase Connection

Tk.400/=

G.P.

a) Single Phase Connection

Tk.200/=

b) Three Phase (without Demand)

Tk.400/=

c) Three Phase (with Demand)

Tk.1,000/=

L.P.

Large Industry (with Demand)

Tk.1,000/=